Notification of Sunday Works at Langhope Rig Wind Farm

Gael Force Renewables are the Principal Contractor currently carrying out construction works to prepare for the construction of the Langhope Rig Wind Farm located within Ettrick Forrest, on behalf of SSE Renewables. 

We are notifing you that from time to time it may be necessary to carry out work on Sundays throughout the Langhope Project .  Any works required to take place on a Sunday will be located within the forest area, circa 5 miles from the entrance to the site off the B711 at Almoor Reservoir, and therefore the works will not enfringe on your privacy or cause disruption.

We will be running a mini-bus from Hawick which will take operatives to and from the site this will will limit the traffic movements on the B711 during the day.  

If, however, you encounter any difficulty as a result of our Sunday works or have a planned event that you would like to discuss with us that will have an interface please contact myself, Ann McAnallen, on 07824 635861 / ann.mcanallen@mclh.co.uk or our assistant Site Manager, Greg Brown, on 07436035772 / greg.brown@alexander-civil.co.uk and we will ensure that your query is dealt with.

I would like to take this opportunity to thank you for your co-operation  and assure you that we will keep you informed of any other possible disruptions that may occur throughout the project.

Ann McAnallen
Gael Force Renewables